About the project

Galana Oil Kenya has engaged DESWA repeatedly since 2022 for electrical works at its Delta service stations. The work spans four counties and covers the full range of station power needs: separating station, shop and cafeteria supplies onto their own meters, upgrading Delta Kisii to three-phase supply, dressing the meter box and connecting power at the new Delta Ndenderu site, fitting an automatic changeover at Delta Athi River, restoring supply at Delta Rironi with a new 250A MCCB, and installing ten KPLC token meters for the Ndenderu containers and houses.

Each job was delivered with the Kenya Power application and follow-up handled by DESWA, and closed out with inspection, wiring and completion certificates.

Scope of works

  • Power and meter separation
  • Three-phase upgrade
  • New-site meter box dressing and power connection
  • Automatic changeover
  • Power blackout restoration and KPLC token meter installation
  • Inspection and completion certificates

Gallery

Delta service station with its pole-mounted transformer
Delta service station with its pole-mounted transformer

Delivery record

  1. Feb 2022Power separation at Delta Athi River, with inspection and wiring certificates
  2. Mar 2022New power house and meter box at Delta Matasia
  3. Apr 2022Power upgrade to three phase at Delta Kisii, including a 400A MCCB
  4. May 2022Power and meter separation at Delta Ruaka, including the shop and cafeteria
  5. Dec 2022New-site meter box dressing and power connection at Delta Ndenderu, Kiambu
  6. Jan 2023Meter separation at Delta Kiambu Road
  7. Apr 2023Shop changeover and separate meter box at Delta Athi River, with a 100A automatic changeover
  8. Jun 2023Parking yard meter separation and blackout restoration at Delta Rironi, including a new 250A MCCB
  9. Apr 2024Supply and installation of 10 KPLC token meters for the Ndenderu containers and houses